Your most trusted training and consulting partner
Engineering & Technical Courses
Found
384 Results
Page
1 of
1
Course Title | Start Date | Duration | Location | Course Code | Registration |
---|---|---|---|---|---|
Operational Troubleshooting & Analyze production reports | 21-Apr-24 | 5 Days | Cairo- Egypt | ENG-D-01Â Â Â Â Â Â Â | |
Perform Troubleshooting Of Crude & Gas Processing Units | 21-Apr-24 | 5 Days | Cairo- Egypt | ENG-D-02Â Â Â Â Â Â Â | |
Electrical Preventive Maintenance | 21-Apr-24 | 5 Days | Cairo- Egypt | ENG-D-03Â Â Â Â Â Â Â | |
Troubleshooting Of Crude Processing Units & Checking Data Accuracy | 21-Apr-24 | 5 Days | Cairo- Egypt | ENG-D-04Â Â Â Â Â Â Â | |
Operate & Check Control Systems Functions | 21-Apr-24 | 5 Days | Cairo- Egypt | ENG-D-05Â Â Â Â Â Â Â | |
Preventive predictive & corrective maintenance off field Instrument | 28-Apr-24 | 5 Days | Dubai - (UAE) | ENG-D-06Â Â Â Â Â Â Â | |
Troubleshooting And Problem Solving Production Chemistry | 28-Apr-24 | 5 Days | Cairo- Egypt | ENG-D-07Â Â Â Â Â Â Â | |
Protection Relay Maintenance, Application & Testing | 28-Apr-24 | 5 Days | Cairo- Egypt | ENG-D-08Â Â Â Â Â Â Â | |
Carry Out Preventive, Predictive And Corrective Maintenance | 28-Apr-24 | 5 Days | Dubai - (UAE) | ENG-D-09Â Â Â Â Â Â Â | |
Maintaining Process Gas Compressors & Quantitative Risk Analysis | 28-Apr-24 | 5 Days | Dubai - (UAE) | ENG-D-10Â Â Â Â Â Â Â | |
Troubleshooting Oil and Gas Processing Facilities | 28-Apr-24 | 5 Days | Cairo- Egypt | ENG-D-11Â Â Â Â Â Â Â | |
Review Piping And Instrumentations Diagrams (P&ID’s) | 05-May-24 | 5 Days | London - United Kingdom | ENG-D-12Â Â Â Â Â Â Â | |
Maintaining Process Gas Compressors & Gas Engines | 05-May-24 | 5 Days | Cairo- Egypt | ENG-D-13Â Â Â Â Â Â Â | |
Learn Complex Operational Troubleshooting | 05-May-24 | 5 Days | Cairo- Egypt | ENG-D-14Â Â Â Â Â Â Â | |
Perform Troubleshooting Of Crude & Gas Processing Units | 05-May-24 | 5 Days | Dubai - (UAE) | ENG-D-15Â Â Â Â Â Â Â | |
Safety Relief Valve Sizing, Selection, Operation, Inspection | 05-May-24 | 5 Days | Cairo- Egypt | ENG-D-16Â Â Â Â Â Â Â | |
Mechanical & Electronical Control | 05-May-24 | 5 Days | Dubai - (UAE) | ENG-D-17Â Â Â Â Â Â Â | |
Modern Industrial Control Systems | 12-May-24 | 5 Days | Cairo- Egypt | ENG-D-18Â Â Â Â Â Â Â | |
Pneumatic and Hydraulic Control Systems | 12-May-24 | 5 Days | South Korea | ENG-D-19Â Â Â Â Â Â Â | |
Operation of Production Systems &Â Process Upsets, Troubleshooting and Optimization | 12-May-24 | 5 Days | Cairo- Egypt | ENG-D-20Â Â Â Â Â Â Â | |
Boosting Gas Flow Equipment and Operations | 12-May-24 | 5 Days | Cairo- Egypt | ENG-D-21Â Â Â Â Â Â Â | |
Boosting Gas Flow Equipment and Operations | 12-May-24 | 5 Days | Dubai - (UAE) | ENG-D-22Â Â Â Â Â Â Â | |
Operational Safety and Control In Oil & Gas | 12-May-24 | 5 Days | Dubai - (UAE) | ENG-D-23Â Â Â Â Â Â Â | |
Operational Safety and Control In Oil & Gas | 19-May-24 | 5 Days | Cairo- Egypt | ENG-D-24Â Â Â Â Â Â Â | |
Production Quality & Process Troubleshooting | 19-May-24 | 5 Days | Dubai - (UAE) | ENG-D-25Â Â Â Â Â Â Â | |
Production Quality & Process Troubleshooting | 19-May-24 | 5 Days | Cairo- Egypt | ENG-D-26Â Â Â Â Â Â Â | |
Water Treatment Process, operation, troubleshooting and water transfer | 19-May-24 | 5 Days | Cairo- Egypt | ENG-D-27Â Â Â Â Â Â Â | |
Water Treatment Process, operation, troubleshooting and water transfer | 19-May-24 | 5 Days | Dubai - (UAE) | ENG-D-28Â Â Â Â Â Â Â | |
Operation of Production Systems &Â Process Upsets, Troubleshooting and Optimization | 19-May-24 | 5 Days | Cairo- Egypt | ENG-D-29Â Â Â Â Â Â Â | |
Operation of Production Systems &Â Process Upsets, Troubleshooting and Optimization | 19-May-24 | 5 Days | Dubai - (UAE) | ENG-D-30Â Â Â Â Â Â Â | |
Electrical Tracing Systems | 26-May-24 | 5 Days | Cairo- Egypt | ENG-D-31Â Â Â Â Â Â Â | |
Electrical Distribution Network Design | 26-May-24 | 5 Days | Dubai - (UAE) | ENG-D-32Â Â Â Â Â Â Â | |
Power Electronic Converters | 26-May-24 | 5 Days | Cairo- Egypt | ENG-D-33Â Â Â Â Â Â Â | |
Design, Installation and Testing of Underground Cables | 26-May-24 | 5 Days | Dubai - (UAE) | ENG-D-34Â Â Â Â Â Â Â | |
Transformers | 26-May-24 | 5 Days | Dubai - (UAE) | ENG-D-35Â Â Â Â Â Â Â | |
Electrical Distribution Network Design and Planning | 26-May-24 | 5 Days | Cairo- Egypt | ENG-D-36Â Â Â Â Â Â Â | |
Production Quality & Process Troubleshooting | 26-May-24 | 5 Days | Cairo- Egypt | ENG-D-37Â Â Â Â Â Â Â | |
Electronic Circuits | 02-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-38Â Â Â Â Â Â Â | |
HV Motors & Transformers: Design, Operations & Trouble-shooting | 02-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-39Â Â Â Â Â Â Â | |
Recent Trends of Overhead lines | 02-Jun-24 | 5 Days | Dubai - (UAE) | ENG-D-40Â Â Â Â Â Â Â | |
HDSL Installation & Setup | 02-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-41Â Â Â Â Â Â Â | |
Recent Trends in Maintenance of Transmission Networks | 02-Jun-24 | 5 Days | Dubai - (UAE) | ENG-D-42Â Â Â Â Â Â Â | |
Digital and Arithmetic Systems | 09-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-43Â Â Â Â Â Â Â | |
Adaptive Control | 09-Jun-24 | 5 Days | Dubai - (UAE) | ENG-D-44Â Â Â Â Â Â Â | |
Optical Fibers and Telecommunications | 09-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-45Â Â Â Â Â Â Â | |
Power Semiconductor Devices | 09-Jun-24 | 5 Days | Dubai - (UAE) | ENG-D-46Â Â Â Â Â Â Â | |
Energy Conservation Techniques & Technology for Industry | 09-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-47Â Â Â Â Â Â Â | |
Intelligence Network in Communications | 09-Jun-24 | 5 Days | Dubai - (UAE) | ENG-D-48Â Â Â Â Â Â Â | |
Design of Digital Mobile Radio and Antenna | 23-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-49Â Â Â Â Â Â Â | |
Waves Spreading & Frequencies | 23-Jun-24 | 5 Days | Dubai - (UAE) | ENG-D-50Â Â Â Â Â Â Â | |
Construction Quality Control and Site Inspection and How to Improve Productivity? | 23-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-51Â Â Â Â Â Â Â | |
Protection of Reinforcement Concrete . | 23-Jun-24 | 5 Days | Dubai - (UAE) | ENG-D-52Â Â Â Â Â Â Â | |
Architectural Drafting and Building Systems | 23-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-53Â Â Â Â Â Â Â | |
Quality Control and Quality Assurance of Concrete & Related Field Practices | 23-Jun-24 | 5 Days | South Korea | ENG-D-54Â Â Â Â Â Â Â | |
Recent Methods of Land Survey | 23-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-55Â Â Â Â Â Â Â | |
Construction and Maintenance of Asphalt and Gravel Roads | 30-Jun-24 | 5 Days | Dubai - (UAE) | ENG-D-56Â Â Â Â Â Â Â | |
Production Quality & Process Troubleshooting | 30-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-57Â Â Â Â Â Â Â | |
Environmental Architectural Using PC | 30-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-58Â Â Â Â Â Â Â | |
Deterioration and Protection of Concrete Structures (Maintenance Systems) | 30-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-59Â Â Â Â Â Â Â | |
Updated Building and Maintenance Systems | 30-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-60Â Â Â Â Â Â Â | |
Advanced Capital Project Evaluation & Decision Making | 30-Jun-24 | 5 Days | London - United Kingdom | ENG-D-61Â Â Â Â Â Â Â | |
Economic & Technical Evaluations in Engineering & Maintenance Projects | 30-Jun-24 | 5 Days | Cairo- Egypt | ENG-D-62Â Â Â Â Â Â Â | |
Negotiation & Dispute Resolutions | 07-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-63Â Â Â Â Â Â Â | |
Project Management: From Idea to Implementation & Beyond | 14-Jul-24 | 5 Days | Dubai - (UAE) | ENG-D-64Â Â Â Â Â Â Â | |
Projects Integration in Operating Plants | 14-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-65Â Â Â Â Â Â Â | |
Technical Specifications and Proposals Evaluation | 14-Jul-24 | 5 Days | Dubai - (UAE) | ENG-D-66Â Â Â Â Â Â Â | |
Operation of Production Systems &Â Process Upsets, Troubleshooting and Optimization | 14-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-67Â Â Â Â Â Â Â | |
Pneumatic Systems and Applications | 14-Jul-24 | 5 Days | Dubai - (UAE) | ENG-D-68Â Â Â Â Â Â Â | |
Tanks Design and Maintenance | 14-Jul-24 | 5 Days | Dubai - (UAE) | ENG-D-69Â Â Â Â Â Â Â | |
Management of High Risk Water Systems & Cooling Towers | 14-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-70Â Â Â Â Â Â Â | |
Air & Gas Compressor (Operation & Maintenance) | 21-Jul-24 | 5 Days | Dubai - (UAE) | ENG-D-71Â Â Â Â Â Â Â | |
Risk Based Inspection Implementation Integration & Management | 21-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-72Â Â Â Â Â Â Â | |
Asset Life Cycle & Maintenance Management | 21-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-73Â Â Â Â Â Â Â | |
Economic and Technical Evaluations for Engineering and Maintenance Projects | 21-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-74Â Â Â Â Â Â Â | |
Cooling Tower Water Technology | 21-Jul-24 | 5 Days | Dubai - (UAE) | ENG-D-75Â Â Â Â Â Â Â | |
Monitor Gas Flaring & Effluent Water Disposal | 21-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-76Â Â Â Â Â Â Â | |
Process Equipments : Fire Heaters, Air Coolers, Heat Exchangers, Piping, Pumps, Compressors, process | 21-Jul-24 | 5 Days | Dubai - (UAE) | ENG-D-77Â Â Â Â Â Â Â | |
Production Quality & Process Troubleshooting | 21-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-78Â Â Â Â Â Â Â | |
Maintenance of Boilers and Steam Generation Systems | 28-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-79Â Â Â Â Â Â Â | |
Control Valve Technology and Maintenance | 28-Jul-24 | 5 Days | Dubai - (UAE) | ENG-D-80Â Â Â Â Â Â Â | |
Prevention of Chemical spills, Controlling Corrosion & Chromatographic testing of Water | 28-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-81Â Â Â Â Â Â Â | |
Engineering Graphic ( for Industrial Engineering ) | 28-Jul-24 | 5 Days | Dubai - (UAE) | ENG-D-82Â Â Â Â Â Â Â | |
Process Equipments : Selection , Sizing , Applications , Design , Operation , Troubleshooting and Maintenance | 28-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-83Â Â Â Â Â Â Â | |
Operation and Maintenance of Industrial Boilers | 28-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-84Â Â Â Â Â Â Â | |
Maintenance Rotating Furnaces | 28-Jul-24 | 5 Days | Cairo- Egypt | ENG-D-85Â Â Â Â Â Â Â | |
Maintenance & Programming of Heavy Duty Equipments | 04-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-86Â Â Â Â Â Â Â | |
Maintenance of Mills and Breakers | 04-Aug-24 | 5 Days | Dubai - (UAE) | ENG-D-87Â Â Â Â Â Â Â | |
Achieving the Target of Oil Wells Production Using International Standards, Developing Performance and Facilitating Risk Assessment | 04-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-88Â Â Â Â Â Â Â | |
Reverse Engineering | 04-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-89Â Â Â Â Â Â Â | |
Recent Trends in Transportation Management and Maintenance | 04-Aug-24 | 5 Days | Dubai - (UAE) | ENG-D-90Â Â Â Â Â Â Â | |
Fault Diagnosis of Pumps, Turbines and Compressors | 04-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-91Â Â Â Â Â Â Â | |
Predictive Maintenance | 04-Aug-24 | 5 Days | Dubai - (UAE) | ENG-D-92Â Â Â Â Â Â Â | |
Product Handling | 04-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-93Â Â Â Â Â Â Â | |
Lifting Equipment Inspection | 04-Aug-24 | 5 Days | Kuala Lumpur | ENG-D-94Â Â Â Â Â Â Â | |
Operation and Maintenance of Cranes | 11-Aug-24 | 5 Days | Dubai - (UAE) | ENG-D-95Â Â Â Â Â Â Â | |
Solar Turbines (Maintenance & Repair) | 11-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-96Â Â Â Â Â Â Â | |
Heating and Air Condition System Design Using Computer | 11-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-97Â Â Â Â Â Â Â | |
Gears ( Manufacturing – Maintenance & Repair ) | 11-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-98       | |
Design of Water Pipes Networks Using PC | 11-Aug-24 | 5 Days | South Korea | ENG-D-99Â Â Â Â Â Â Â | |
Total Recent Maintenance Methods Using Reliability | 11-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-100Â Â Â | |
Using Reveres Engineering in Manufacturing Spare Parts | 11-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-101Â Â Â | |
HVAC: Design ,Operation , Maintenance & Repair | 11-Aug-24 | 5 Days | Dubai - (UAE) | ENG-D-102Â Â Â | |
Reliability Centered Maintenance (RCM) | 11-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-103Â Â Â | |
Reading Schematics and symbol | 18-Aug-24 | 5 Days | Morocco | ENG-D-104Â Â Â | |
Integrated Contingency Planning for Industrial Emergencies (ICP ) | 18-Aug-24 | 5 Days | Dubai - (UAE) | ENG-D-105Â Â Â | |
Maintenance Using Computer | 18-Aug-24 | 5 Days | Dubai - (UAE) | ENG-D-106Â Â Â | |
Oil Lubrication | 18-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-107Â Â Â | |
Managing Efficient Shutdowns | 18-Aug-24 | 5 Days | Kuala Lumpur | ENG-D-108Â Â Â | |
Operational Troubleshooting, Data Accuracy and Review Daily Production Reports | 18-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-109Â Â Â | |
Maintenance and Repair of Turbine Blades | 18-Aug-24 | 5 Days | Dubai - (UAE) | ENG-D-110Â Â Â | |
Commissioning, Testing and Start-Up of Electrical Systems | 18-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-111Â Â Â | |
Protection Schemes for Generators & Recomended Settings | 18-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-112Â Â Â | |
Electrical Controls Panel Designing | 25-Aug-24 | 5 Days | Kuala Lumpur | ENG-D-113Â Â Â | |
Planning And Managing Shutdowns, Turnarounds | 25-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-114Â Â Â | |
Pumps & Compressors: Predictive Maintenance & Diagnostics | 25-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-115Â Â Â | |
Analytical Prevention Of Machinery Failure, PM & Troubleshooting Of Plant Rotating Equipment | 25-Aug-24 | 5 Days | Dubai - (UAE) | ENG-D-116Â Â Â | |
Management Of Boilers, Steam Turbines & Steam Plant | 25-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-117Â Â Â | |
Above Ground Storage Tanks : Design, Operation And Maintenance | 25-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-118Â Â Â | |
Advanced Valve Technology: Design, Selection, Installation, Applications, Sizing, Inspection, Maintenance | 25-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-119Â Â Â | |
Pump Technology (Selection, Operation & Maintenance) | 25-Aug-24 | 5 Days | London - United Kingdom | ENG-D-120Â Â Â | |
Modern Maintenance & Reliability Management: Planning, Estimating,Scheduling & Control (Cost Effect) | 25-Aug-24 | 5 Days | Cairo- Egypt | ENG-D-121Â Â Â | |
Control Valve & Actuator: Selection, Calculations, Sizing, Applications, Operation, Diagnostic Testing, Trouble Shooting & Maintenance | 01-Sep-24 | 5 Days | Kuala Lumpur | ENG-D-122Â Â Â | |
Pumps, Compressors, Turbines Operation Maintenance & Troubleshooting | 01-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-123Â Â Â | |
COMPRESSOR & CONTROL SYSTEM | 01-Sep-24 | 5 Days | Dubai - (UAE) | ENG-D-124Â Â Â | |
Centrifugal Compressors And Steam Turbines | 01-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-125Â Â Â | |
Utilities And Energy Systems Design And Performance In Refineries And Petrochemical Plants | 01-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-126Â Â Â | |
Boiler Operation, Maintenance & Water Treatment Technology | 01-Sep-24 | 5 Days | Dubai - (UAE) | ENG-D-127Â Â Â | |
Rotating Equipment Selection, Operation, Maintenance, Inspection & Troubleshooting | 01-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-128Â Â Â | |
Achieving CMMS Data Integrity | 01-Sep-24 | 5 Days | Kuala Lumpur | ENG-D-129Â Â Â | |
Certified Reliability Engineer (CRE): American Society For Quality (ASQ) | 08-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-130Â Â Â | |
Asset Integrity Management System | 08-Sep-24 | 5 Days | Morocco | ENG-D-131Â Â Â | |
Maintenance Management Professional (Maintenance Planning, Scheduling And Work Control) | 08-Sep-24 | 5 Days | Dubai - (UAE) | ENG-D-132Â Â Â | |
Rotating Equipment Reliability Optimization | 08-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-133Â Â Â | |
Preventive & Predictive Maintenance | 08-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-134Â Â Â | |
Certified Maintenance Planner (CMP): Maintenance Planning, Scheduling & Work Control | 08-Sep-24 | 5 Days | Dubai - (UAE) | ENG-D-135Â Â Â | |
Pumps, Compressors, Turbines & Troubleshooting | 08-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-136Â Â Â | |
Machinery Failure Analysis And Prevention | 08-Sep-24 | 5 Days | Dubai - (UAE) | ENG-D-137Â Â Â | |
Advanced Maintenance In Offshore Industries | 08-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-138Â Â Â | |
Practical Pump Technology Selection, Operation & Maintenance | 15-Sep-24 | 5 Days | Kuala Lumpur | ENG-D-139Â Â Â | |
Pipeline Design and Construction | 15-Sep-24 | 5 Days | Dubai - (UAE) | ENG-D-140Â Â Â | |
Hydraulic calculation for Pipe flow | 15-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-141Â Â Â | |
Optimization and Operating Conditions for Petroleum Refining | 15-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-142Â Â Â | |
Reservoir Simulation | 15-Sep-24 | 5 Days | London - United Kingdom | ENG-D-143Â Â Â | |
Pipeline Integrated Management | 15-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-144Â Â Â | |
Process Operation Plant & Troubleshooting | 15-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-145Â Â Â | |
Horizontal and Multilateral Wells: Analysis and Design | 15-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-146Â Â Â | |
Wellsite Geology and Mudlogging | 22-Sep-24 | 5 Days | Dubai - (UAE) | ENG-D-147Â Â Â | |
Structural and Stratigraphic Interpreation of Dipmeters and Borehole Imaging Logs | 22-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-148Â Â Â | |
Integration of Rocks, log and Test Date | 22-Sep-24 | 5 Days | Morocco | ENG-D-149Â Â Â | |
Quality Control of Jet Fuel | 22-Sep-24 | 5 Days | Dubai - (UAE) | ENG-D-150Â Â Â | |
Water Hammering in Pipelines and Other Cases . | 22-Sep-24 | 5 Days | Dubai - (UAE) | ENG-D-151Â Â Â | |
Oil Movement, Storage & Troubleshooting in Modern Refineries, Marine Terminals & Oil Plants | 22-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-152Â Â Â | |
Reservoir Fluid Sampling PVT & Composition Analysis | 22-Sep-24 | 5 Days | Kuala Lumpur | ENG-D-153Â Â Â | |
Operational Troubleshooting & Analyze production reports | 22-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-154Â Â Â | |
Perform Troubleshooting Of Crude & Gas Processing Units | 29-Sep-24 | 5 Days | Dubai - (UAE) | ENG-D-155Â Â Â | |
Electrical Preventive Maintenance | 29-Sep-24 | 5 Days | London - United Kingdom | ENG-D-156Â Â Â | |
Troubleshooting Of Crude Processing Units & Checking Data Accuracy | 29-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-157Â Â Â | |
Operate & Check Control Systems Functions | 29-Sep-24 | 5 Days | Kuala Lumpur | ENG-D-158Â Â Â | |
Preventive predictive & corrective maintenance off field Instrument | 29-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-159Â Â Â | |
Troubleshooting And Problem Solving Production Chemistry | 29-Sep-24 | 5 Days | Cairo- Egypt | ENG-D-160Â Â Â | |
Protection Relay Maintenance, Application & Testing | 29-Sep-24 | 5 Days | Dubai - (UAE) | ENG-D-161Â Â Â | |
Carry Out Preventive, Predictive And Corrective Maintenance | 06-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-162Â Â Â | |
Maintaining Process Gas Compressors & Quantitative Risk Analysis | 06-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-163Â Â Â | |
Preventive & Corrective Maintenance | 06-Oct-24 | 5 Days | South Korea | ENG-D-164Â Â Â | |
Review Piping And Instrumentations Diagrams (P&ID’s) | 06-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-165Â Â Â | |
Maintaining Process Gas Compressors & Gas Engines | 06-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-166Â Â Â | |
Learn Complex Operational Troubleshooting | 06-Oct-24 | 5 Days | Kuala Lumpur | ENG-D-167Â Â Â | |
Perform Troubleshooting Of Crude & Gas Processing Units | 06-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-168Â Â Â | |
Safety Relief Valve Sizing, Selection, Operation, Inspection | 06-Oct-24 | 5 Days | Dubai - (UAE) | ENG-D-169Â Â Â | |
Mechanical & Electronical Control | 06-Oct-24 | 5 Days | Morocco | ENG-D-170Â Â Â | |
Modern Industrial Control Systems | 13-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-171Â Â Â | |
Pneumatic and Hydraulic Control Systems | 13-Oct-24 | 5 Days | Dubai - (UAE) | ENG-D-172Â Â Â | |
Controllers & Control Loops | 13-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-173Â Â Â | |
Moving From DCS to Field Bus | 13-Oct-24 | 5 Days | Kuala Lumpur | ENG-D-174Â Â Â | |
Control Valve Actuators & Positioners | 13-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-175Â Â Â | |
Fuzzy Control Systems | 13-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-176Â Â Â | |
Planning, Justifying, Executing Automation and Control Projects | 13-Oct-24 | 5 Days | Dubai - (UAE) | ENG-D-177Â Â Â | |
Tuning Control Loops, Feedback and Advanced Controllers | 13-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-178Â Â Â | |
Modern Power System Protective Relaying | 13-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-179Â Â Â | |
Power Capacitors: Applications, Switching problems, Protection & Maintenance. | 20-Oct-24 | 5 Days | Dubai - (UAE) | ENG-D-180Â Â Â | |
Combustion Control System | 20-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-181Â Â Â | |
Configuring and Testing Smart Field Devices | 20-Oct-24 | 5 Days | Dubai - (UAE) | ENG-D-182Â Â Â | |
Electrical Drawings Schematics | 20-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-183Â Â Â | |
Electrical Tracing Systems | 20-Oct-24 | 5 Days | Kuala Lumpur | ENG-D-184Â Â Â | |
Electrical Distribution Network Design | 20-Oct-24 | 5 Days | Dubai - (UAE) | ENG-D-185Â Â Â | |
Power Electronic Converters | 20-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-186Â Â Â | |
Design, Installation and Testing of Underground Cables | 20-Oct-24 | 5 Days | Turkey | ENG-D-187Â Â Â | |
Transformers | 20-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-188Â Â Â | |
Electrical Distribution Network Design and Planning | 27-Oct-24 | 5 Days | London - United Kingdom | ENG-D-189Â Â Â | |
Digital Systems | 27-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-190Â Â Â | |
Electronic Circuits | 27-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-191Â Â Â | |
HV Motors & Transformers: Design, Operations & Trouble-shooting | 27-Oct-24 | 5 Days | Dubai - (UAE) | ENG-D-192Â Â Â | |
Planning And Managing Shutdowns, Turnarounds | 27-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-193Â Â Â | |
Pumps & Compressors: Predictive Maintenance & Diagnostics | 27-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-194Â Â Â | |
Analytical Prevention Of Machinery Failure, PM & Troubleshooting Of Plant Rotating Equipment | 27-Oct-24 | 5 Days | Dubai - (UAE) | ENG-D-195Â Â Â | |
Management Of Boilers, Steam Turbines & Steam Plant | 27-Oct-24 | 5 Days | Dubai - (UAE) | ENG-D-196Â Â Â | |
Above Ground Storage Tanks : Design, Operation And Maintenance | 27-Oct-24 | 5 Days | Cairo- Egypt | ENG-D-197Â Â Â | |
Advanced Valve Technology: Design, Selection, Installation, Applications, Sizing, Inspection, Maintenance | 27-Oct-24 | 5 Days | Kuala Lumpur | ENG-D-198Â Â Â | |
Pump Technology (Selection, Operation & Maintenance) | 03-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-199Â Â Â | |
Modern Maintenance & Reliability Management: Planning, Estimating,Scheduling & Control (Cost Effect) | 03-Nov-24 | 5 Days | Dubai - (UAE) | ENG-D-200Â Â Â | |
Control Valve & Actuator: Selection, Calculations, Sizing, Applications, Operation, Diagnostic Testing, Trouble Shooting & Maintenance | 03-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-201Â Â Â | |
Pumps, Compressors, Turbines Operation Maintenance & Troubleshooting | 03-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-202Â Â Â | |
COMPRESSOR & CONTROL SYSTEM | 03-Nov-24 | 5 Days | Kuala Lumpur | ENG-D-203Â Â Â | |
Centrifugal Compressors And Steam Turbines | 03-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-204Â Â Â | |
Utilities And Energy Systems Design And Performance In Refineries And Petrochemical Plants | 03-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-205Â Â Â | |
Boiler Operation, Maintenance & Water Treatment Technology | 03-Nov-24 | 5 Days | Dubai - (UAE) | ENG-D-206Â Â Â | |
Rotating Equipment Selection, Operation, Maintenance, Inspection & Troubleshooting | 10-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-207Â Â Â | |
Achieving CMMS Data Integrity | 10-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-208Â Â Â | |
Certified Reliability Engineer (CRE): American Society For Quality (ASQ) | 10-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-209Â Â Â | |
Asset Integrity Management System | 10-Nov-24 | 5 Days | London - United Kingdom | ENG-D-210Â Â Â | |
Maintenance Management Professional (Maintenance Planning, Scheduling And Work Control) | 10-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-211Â Â Â | |
Rotating Equipment Reliability Optimization | 10-Nov-24 | 5 Days | Kuala Lumpur | ENG-D-212Â Â Â | |
Preventive & Predictive Maintenance | 10-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-213Â Â Â | |
Certified Maintenance Planner (CMP): Maintenance Planning, Scheduling & Work Control | 10-Nov-24 | 5 Days | Dubai - (UAE) | ENG-D-214Â Â Â | |
Pumps, Compressors, Turbines & Troubleshooting | 17-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-215Â Â Â | |
Machinery Failure Analysis And Prevention | 17-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-216Â Â Â | |
Advanced Maintenance In Offshore Industries | 17-Nov-24 | 5 Days | Dubai - (UAE) | ENG-D-217Â Â Â | |
Practical Pump Technology Selection, Operation & Maintenance | 17-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-218Â Â Â | |
Pipeline Design and Construction | 17-Nov-24 | 5 Days | Kuala Lumpur | ENG-D-219Â Â Â | |
Hydraulic calculation for Pipe flow | 17-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-220Â Â Â | |
Optimization and Operating Conditions for Petroleum Refining | 17-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-221Â Â Â | |
Reservoir Simulation | 17-Nov-24 | 5 Days | Dubai - (UAE) | ENG-D-222Â Â Â | |
Pipeline Integrated Management | 17-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-223Â Â Â | |
Process Operation Plant & Troubleshooting | 24-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-224Â Â Â | |
Risk Based Inspection Implementation Integration & Management | 24-Nov-24 | 5 Days | Dubai - (UAE) | ENG-D-225Â Â Â | |
Asset Life Cycle & Maintenance Management | 24-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-226Â Â Â | |
Economic and Technical Evaluations for Engineering and Maintenance Projects | 24-Nov-24 | 5 Days | Dubai - (UAE) | ENG-D-227Â Â Â | |
Cooling Tower Water Technology | 24-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-228Â Â Â | |
Operational Troubleshooting & Analyze production reports | 24-Nov-24 | 5 Days | Kuala Lumpur | ENG-D-229Â Â Â | |
Perform Troubleshooting Of Crude & Gas Processing Units | 24-Nov-24 | 5 Days | Dubai - (UAE) | ENG-D-230Â Â Â | |
Electrical Preventive Maintenance | 24-Nov-24 | 5 Days | Turkey | ENG-D-231Â Â Â | |
Troubleshooting Of Crude Processing Units & Checking Data Accuracy | 24-Nov-24 | 5 Days | Cairo- Egypt | ENG-D-232Â Â Â | |
Operate & Check Control Systems Functions | 01-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-233Â Â Â | |
Preventive predictive & corrective maintenance off field Instrument | 01-Dec-24 | 5 Days | London - United Kingdom | ENG-D-234Â Â Â | |
Troubleshooting And Problem Solving Production Chemistry | 01-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-235Â Â Â | |
Protection Relay Maintenance, Application & Testing | 01-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-236Â Â Â | |
Carry Out Preventive, Predictive And Corrective Maintenance | 01-Dec-24 | 5 Days | Dubai - (UAE) | ENG-D-237Â Â Â | |
Maintaining Process Gas Compressors & Quantitative Risk Analysis | 01-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-238Â Â Â | |
Troubleshooting Oil and Gas Processing Facilities | 01-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-239Â Â Â | |
Review Piping And Instrumentations Diagrams (P&ID’s) | 08-Dec-24 | 5 Days | Dubai - (UAE) | ENG-D-240Â Â Â | |
Maintaining Process Gas Compressors & Gas Engines | 08-Dec-24 | 5 Days | Dubai - (UAE) | ENG-D-241Â Â Â | |
Learn Complex Operational Troubleshooting | 08-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-242Â Â Â | |
Perform Troubleshooting Of Crude & Gas Processing Units | 08-Dec-24 | 5 Days | Kuala Lumpur | ENG-D-243Â Â Â | |
Safety Relief Valve Sizing, Selection, Operation, Inspection | 08-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-244Â Â Â | |
Mechanical & Electronical Control | 08-Dec-24 | 5 Days | Dubai - (UAE) | ENG-D-245Â Â Â | |
Modern Industrial Control Systems | 08-Dec-24 | 5 Days | Turkey | ENG-D-246Â Â Â | |
Pneumatic and Hydraulic Control Systems | 08-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-247Â Â Â | |
Operation of Production Systems &Â Process Upsets, Troubleshooting and Optimization | 08-Dec-24 | 5 Days | Kuala Lumpur | ENG-D-248Â Â Â | |
Boosting Gas Flow Equipment and Operations | 08-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-249Â Â Â | |
Boosting Gas Flow Equipment and Operations | 15-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-250Â Â Â | |
Operational Safety and Control In Oil & Gas | 15-Dec-24 | 5 Days | Dubai - (UAE) | ENG-D-251Â Â Â | |
Operational Safety and Control In Oil & Gas | 15-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-252Â Â Â | |
Production Quality & Process Troubleshooting | 15-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-253Â Â Â | |
Production Quality & Process Troubleshooting | 15-Dec-24 | 5 Days | London - United Kingdom | ENG-D-254Â Â Â | |
Water Treatment Process, operation, troubleshooting and water transfer | 15-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-255Â Â Â | |
Water Treatment Process, operation, troubleshooting and water transfer | 15-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-256Â Â Â | |
Operation of Production Systems &Â Process Upsets, Troubleshooting and Optimization | 15-Dec-24 | 5 Days | Kuala Lumpur | ENG-D-257Â Â Â | |
Operation of Production Systems &Â Process Upsets, Troubleshooting and Optimization | 15-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-258Â Â Â | |
Electrical Tracing Systems | 22-Dec-24 | 5 Days | Dubai - (UAE) | ENG-D-259Â Â Â | |
Electrical Distribution Network Design | 22-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-260Â Â Â | |
Power Electronic Converters | 22-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-261Â Â Â | |
Design, Installation and Testing of Underground Cables | 22-Dec-24 | 5 Days | Dubai - (UAE) | ENG-D-262Â Â Â | |
Transformers | 22-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-263Â Â Â | |
Electrical Distribution Network Design and Planning | 22-Dec-24 | 5 Days | Kuala Lumpur | ENG-D-264Â Â Â | |
Production Quality & Process Troubleshooting | 22-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-265Â Â Â | |
Electronic Circuits | 22-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-266Â Â Â | |
HV Motors & Transformers: Design, Operations & Trouble-shooting | 29-Dec-24 | 5 Days | Dubai - (UAE) | ENG-D-267Â Â Â | |
Recent Trends of Overhead lines | 29-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-268Â Â Â | |
HDSL Installation & Setup | 29-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-269Â Â Â | |
Recent Trends in Maintenance of Transmission Networks | 29-Dec-24 | 5 Days | Dubai - (UAE) | ENG-D-270Â Â Â | |
Digital and Arithmetic Systems | 29-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-271Â Â Â | |
Adaptive Control | 29-Dec-24 | 5 Days | Dubai - (UAE) | ENG-D-272Â Â Â | |
Optical Fibers and Telecommunications | 29-Dec-24 | 5 Days | Cairo- Egypt | ENG-D-273Â Â Â | |
Power Semiconductor Devices | 29-Dec-24 | 5 Days | Kuala Lumpur | ENG-D-274Â Â Â | |
Energy Conservation Techniques & Technology for Industry | 29-Dec-24 | 5 Days | Dubai - (UAE) | ENG-D-275Â Â Â | |
Intelligence Network in Communications | 05-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-276Â Â Â | |
Design of Digital Mobile Radio and Antenna | 05-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-277Â Â Â | |
Waves Spreading & Frequencies | 05-Jan-25 | 5 Days | London - United Kingdom | ENG-D-278Â Â Â | |
Construction Quality Control and Site Inspection and How to Improve Productivity? | 05-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-279Â Â Â | |
Protection of Reinforcement Concrete . | 05-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-280Â Â Â | |
Architectural Drafting and Building Systems | 05-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-281Â Â Â | |
Quality Control and Quality Assurance of Concrete & Related Field Practices | 05-Jan-25 | 5 Days | Dubai - (UAE) | ENG-D-282Â Â Â | |
Recent Methods of Land Survey | 05-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-283Â Â Â | |
Construction and Maintenance of Asphalt and Gravel Roads | 12-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-284Â Â Â | |
Production Quality & Process Troubleshooting | 12-Jan-25 | 5 Days | Turkey | ENG-D-285Â Â Â | |
Environmental Architectural Using PC | 12-Jan-25 | 5 Days | Dubai - (UAE) | ENG-D-286Â Â Â | |
Deterioration and Protection of Concrete Structures (Maintenance Systems) | 12-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-287Â Â Â | |
Updated Building and Maintenance Systems | 12-Jan-25 | 5 Days | Kuala Lumpur | ENG-D-288Â Â Â | |
Advanced Capital Project Evaluation & Decision Making | 12-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-289Â Â Â | |
Economic & Technical Evaluations in Engineering & Maintenance Projects | 12-Jan-25 | 5 Days | Dubai - (UAE) | ENG-D-290Â Â Â | |
Negotiation & Dispute Resolutions | 12-Jan-25 | 5 Days | London - United Kingdom | ENG-D-291Â Â Â | |
Project Management: From Idea to Implementation & Beyond | 19-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-292Â Â Â | |
Projects Integration in Operating Plants | 19-Jan-25 | 5 Days | Kuala Lumpur | ENG-D-293Â Â Â | |
Technical Specifications and Proposals Evaluation | 19-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-294Â Â Â | |
Operation of Production Systems &Â Process Upsets, Troubleshooting and Optimization | 19-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-295Â Â Â | |
Pneumatic Systems and Applications | 19-Jan-25 | 5 Days | Dubai - (UAE) | ENG-D-296Â Â Â | |
Tanks Design and Maintenance | 19-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-297Â Â Â | |
Management of High Risk Water Systems & Cooling Towers | 19-Jan-25 | 5 Days | South Korea | ENG-D-298Â Â Â | |
Air & Gas Compressor (Operation & Maintenance) | 19-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-299Â Â Â | |
Risk Based Inspection Implementation Integration & Management | 19-Jan-25 | 5 Days | Turkey | ENG-D-300Â Â Â | |
Asset Life Cycle & Maintenance Management | 19-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-301Â Â Â | |
Economic and Technical Evaluations for Engineering and Maintenance Projects | 19-Jan-25 | 5 Days | Kuala Lumpur | ENG-D-302Â Â Â | |
Cooling Tower Water Technology | 26-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-303Â Â Â | |
Monitor Gas Flaring & Effluent Water Disposal | 26-Jan-25 | 5 Days | Dubai - (UAE) | ENG-D-304Â Â Â | |
Process Equipments : Fire Heaters, Air Coolers, Heat Exchangers, Piping, Pumps, Compressors, process | 26-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-305Â Â Â | |
Production Quality & Process Troubleshooting | 26-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-306Â Â Â | |
Maintenance of Boilers and Steam Generation Systems | 26-Jan-25 | 5 Days | Dubai - (UAE) | ENG-D-307Â Â Â | |
Control Valve Technology and Maintenance | 26-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-308Â Â Â | |
Prevention of Chemical spills, Controlling Corrosion & Chromatographic testing of Water | 26-Jan-25 | 5 Days | Kuala Lumpur | ENG-D-309Â Â Â | |
Engineering Graphic ( for Industrial Engineering ) | 26-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-310Â Â Â | |
Process Equipments : Selection , Sizing , Applications , Design , Operation , Troubleshooting and Maintenance | 26-Jan-25 | 5 Days | Cairo- Egypt | ENG-D-311Â Â Â | |
Operation and Maintenance of Industrial Boilers | 02-Feb-25 | 5 Days | Dubai - (UAE) | ENG-D-312Â Â Â | |
Maintenance Rotating Furnaces | 02-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-313Â Â Â | |
Maintenance & Programming of Heavy Duty Equipments | 02-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-314Â Â Â | |
Maintenance of Mills and Breakers | 02-Feb-25 | 5 Days | Dubai - (UAE) | ENG-D-315Â Â Â | |
Achieving the Target of Oil Wells Production Using International Standards, Developing Performance and Facilitating Risk Assessment | 02-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-316Â Â Â | |
Reverse Engineering | 02-Feb-25 | 5 Days | Dubai - (UAE) | ENG-D-317Â Â Â | |
Recent Trends in Transportation Management and Maintenance | 02-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-318Â Â Â | |
Fault Diagnosis of Pumps, Turbines and Compressors | 02-Feb-25 | 5 Days | Kuala Lumpur | ENG-D-319Â Â Â | |
Predictive Maintenance | 02-Feb-25 | 5 Days | Dubai - (UAE) | ENG-D-320Â Â Â | |
Product Handling | 02-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-321Â Â Â | |
Lifting Equipment Inspection | 09-Feb-25 | 5 Days | New York State | ENG-D-322Â Â Â | |
Operation and Maintenance of Cranes | 09-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-323Â Â Â | |
Solar Turbines (Maintenance & Repair) | 09-Feb-25 | 5 Days | London - United Kingdom | ENG-D-324Â Â Â | |
Heating and Air Condition System Design Using Computer | 09-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-325Â Â Â | |
Gears ( Manufacturing – Maintenance & Repair ) | 09-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-326   | |
Design of Water Pipes Networks Using PC | 09-Feb-25 | 5 Days | Dubai - (UAE) | ENG-D-327Â Â Â | |
Total Recent Maintenance Methods Using Reliability | 09-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-328Â Â Â | |
Using Reveres Engineering in Manufacturing Spare Parts | 09-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-329Â Â Â | |
HVAC: Design ,Operation , Maintenance & Repair | 16-Feb-25 | 5 Days | Dubai - (UAE) | ENG-D-330Â Â Â | |
Reliability Centered Maintenance (RCM) | 16-Feb-25 | 5 Days | Dubai - (UAE) | ENG-D-331Â Â Â | |
Reading Schematics and symbol | 16-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-332Â Â Â | |
Integrated Contingency Planning for Industrial Emergencies (ICP ) | 16-Feb-25 | 5 Days | Kuala Lumpur | ENG-D-333Â Â Â | |
Maintenance Using Computer | 16-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-334Â Â Â | |
Oil Lubrication | 16-Feb-25 | 5 Days | Dubai - (UAE) | ENG-D-335Â Â Â | |
Managing Efficient Shutdowns | 16-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-336Â Â Â | |
Operational Troubleshooting, Data Accuracy and Review Daily Production Reports | 16-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-337Â Â Â | |
Maintenance and Repair of Turbine Blades | 16-Feb-25 | 5 Days | Kuala Lumpur | ENG-D-338Â Â Â | |
Commissioning, Testing and Start-Up of Electrical Systems | 16-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-339Â Â Â | |
Protection Schemes for Generators & Recomended Settings | 23-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-340Â Â Â | |
Electrical Controls Panel Designing | 23-Feb-25 | 5 Days | Dubai - (UAE) | ENG-D-341Â Â Â | |
Planning And Managing Shutdowns, Turnarounds | 23-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-342Â Â Â | |
Pumps & Compressors: Predictive Maintenance & Diagnostics | 23-Feb-25 | 5 Days | London - United Kingdom | ENG-D-343Â Â Â | |
Analytical Prevention Of Machinery Failure, PM & Troubleshooting Of Plant Rotating Equipment | 23-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-344Â Â Â | |
Management Of Boilers, Steam Turbines & Steam Plant | 23-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-345Â Â Â | |
Above Ground Storage Tanks : Design, Operation And Maintenance | 23-Feb-25 | 5 Days | Cairo- Egypt | ENG-D-346Â Â Â | |
Advanced Valve Technology: Design, Selection, Installation, Applications, Sizing, Inspection, Maintenance | 23-Feb-25 | 5 Days | Kuala Lumpur | ENG-D-347Â Â Â | |
Pump Technology (Selection, Operation & Maintenance) | 02-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-348Â Â Â | |
Modern Maintenance & Reliability Management: Planning, Estimating,Scheduling & Control (Cost Effect) | 02-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-349Â Â Â | |
Control Valve & Actuator: Selection, Calculations, Sizing, Applications, Operation, Diagnostic Testing, Trouble Shooting & Maintenance | 02-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-350Â Â Â | |
Pumps, Compressors, Turbines Operation Maintenance & Troubleshooting | 02-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-351Â Â Â | |
COMPRESSOR & CONTROL SYSTEM | 02-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-352Â Â Â | |
Centrifugal Compressors And Steam Turbines | 02-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-353Â Â Â | |
Utilities And Energy Systems Design And Performance In Refineries And Petrochemical Plants | 02-Mar-25 | 5 Days | Kuala Lumpur | ENG-D-354Â Â Â | |
Boiler Operation, Maintenance & Water Treatment Technology | 09-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-355Â Â Â | |
Rotating Equipment Selection, Operation, Maintenance, Inspection & Troubleshooting | 09-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-356Â Â Â | |
Achieving CMMS Data Integrity | 09-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-357Â Â Â | |
Certified Reliability Engineer (CRE): American Society For Quality (ASQ) | 09-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-358Â Â Â | |
Asset Integrity Management System | 09-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-359Â Â Â | |
Maintenance Management Professional (Maintenance Planning, Scheduling And Work Control) | 09-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-360Â Â Â | |
Rotating Equipment Reliability Optimization | 09-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-361Â Â Â | |
Preventive & Predictive Maintenance | 16-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-362Â Â Â | |
Certified Maintenance Planner (CMP): Maintenance Planning, Scheduling & Work Control | 16-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-363Â Â Â | |
Pumps, Compressors, Turbines & Troubleshooting | 16-Mar-25 | 5 Days | Kuala Lumpur | ENG-D-364Â Â Â | |
Machinery Failure Analysis And Prevention | 16-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-365Â Â Â | |
Advanced Maintenance In Offshore Industries | 16-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-366Â Â Â | |
Practical Pump Technology Selection, Operation & Maintenance | 16-Mar-25 | 5 Days | London - United Kingdom | ENG-D-367Â Â Â | |
Pipeline Design and Construction | 16-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-368Â Â Â | |
Hydraulic calculation for Pipe flow | 16-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-369Â Â Â | |
Optimization and Operating Conditions for Petroleum Refining | 23-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-370Â Â Â | |
Reservoir Simulation | 23-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-371Â Â Â | |
Pipeline Integrated Management | 23-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-372Â Â Â | |
Process Operation Plant & Troubleshooting | 23-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-373Â Â Â | |
Horizontal and Multilateral Wells: Analysis and Design | 23-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-374Â Â Â | |
Wellsite Geology and Mudlogging | 23-Mar-25 | 5 Days | New York State | ENG-D-375Â Â Â | |
Structural and Stratigraphic Interpreation of Dipmeters and Borehole Imaging Logs | 23-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-376Â Â Â | |
Integration of Rocks, log and Test Date | 23-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-377Â Â Â | |
Quality Control of Jet Fuel | 30-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-378Â Â Â | |
Water Hammering in Pipelines and Other Cases . | 30-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-379Â Â Â | |
Oil Movement, Storage & Troubleshooting in Modern Refineries, Marine Terminals & Oil Plants | 30-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-380Â Â Â | |
Reservoir Fluid Sampling PVT & Composition Analysis | 30-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-381Â Â Â | |
Operational Troubleshooting & Analyze production reports | 30-Mar-25 | 5 Days | Cairo- Egypt | ENG-D-382Â Â Â | |
Perform Troubleshooting Of Crude & Gas Processing Units | 30-Mar-25 | 5 Days | Dubai - (UAE) | ENG-D-383Â Â Â | |
Electrical Preventive Maintenance | 30-Mar-25 | 5 Days | London - United Kingdom | ENG-D-384Â Â Â |